fbpx
Loading...
Home/CSO Discharge

CSO Discharge

CSO Discharge2020-05-29T19:02:18+00:00

Initial Notice of CSO Discharges

The City of Nappanee operates a Combined Sewer System (CSS), a wastewater collection system which conveys sanitary wastewaters (domestic, commercial and industrial wastewaters) and storm water through a single pipe system ot the Publicly Owned Treatment Works (POTW). A combined Sewer Overflow (CSO) is the discharge from a CSS at a point prior to the POTW. The City is required to notify the public within four (4) hours of the City becoming aware of a CSO event. This notification serves to alert you of a recent CSO event:

Impacted waterbody: Berlin Court Ditch
Location of discharge: CSO 018, just south of City’s Wastewater Treatment Plant
Identification of public access areas impacted: None
Date and Time CSO started: 5/28/2020     9:30 PM
Date and time CSO ended: 5/29/2020     8:00 AM

For more information please call the Nappanee Wastewater Treatment Plant at 574-773-3033

Supplemental Notice of CSO Discharges

The City of Nappanee operates a Combined Sewer System (CSS), a wastewater collection system which conveys sanitary wastewaters (domestic, commercial and industrial wastewaters) and storm water through a single pipe system to the Publicly Owned Treatment Works (POTW). A combined Sewer Overflow (CSO) is the discharge from a CSS at a point prior to the POTW. The City is required to notify the public within four (4) hours of the City becoming aware of a CSO event and provide supplement information with seven (7) days, if necessary. This notification is intended to supplement the initial alert you received concerning the CSO event on   5/28/2020  AT CSO 18:

Volume of discharge:   1.823 MG
Date / Time the discharge ended:  5/29/2020   8:00 AM

For more information please call the Nappanee Wastewater Treatment Plant at 574-773-3033

Notice of CSO DischargeView Notice